Steel frame & crane

A crane will be onsite from the week beginning 17th June 2019.


This will be for the erection of a steel frame building that will take 2 to 3 weeks.


The contractor will liaise with the school as and when required.


Lewisham Building Control will visit the site during the erection of the steel frame.